Choo, H J, Tommelein, I D, Ballard, G and Zabelle, T R (1999) WorkPlan: Constraint-Based Database for Work Package Scheduling. Journal of Construction Engineering and Management, 125(03), 151–60.

Chua, D K H, Kog, Y C and Loh, P K (1999) Critical Success Factors for Different Project Objectives. Journal of Construction Engineering and Management, 125(03), 142–50.

  • Type: Journal Article
  • Keywords:
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)0733-9364(1999)125:3(142)
  • Abstract:
    The identification of key factors for construction project success enables appropriate allocation of limited resources. Most of the related past work only identified critical success factors for construction projects in general. The present study seeks to distinguish these factors according to the project objectives of budget, schedule, and quality. The analytic hierarchy process is adopted to determine the relative importance of success-related factors. A hierarchical model for construction project success is presented. Sixty-seven success-related factors are considered. These factors are grouped under four main project aspects, namely, project characteristics, contractual arrangements, project participants, and interactive processes in the hierarchical model for project success. A questionnaire was developed to facilitate systematic data collection in this study. Experts with an overall average of 20 years of experience in the construction industry were invited to participate in the survey. Critical success factors addressing budget performance, schedule performance, quality performance, and overall project success are identified. Some pertinent findings of the study are discussed. Comparisons with findings of previous studies using neural network approach are also presented.

Gransberg, D D, Dillon, W D, Reynolds, L and Boyd, J (1999) Quantitative Analysis of Partnered Project Performance. Journal of Construction Engineering and Management, 125(03), 161–6.

Hanna, A S, Russell, J S, Gotzion, T W and Nordheim, E V (1999) Impact of Change Orders on Labor Efficiency for Mechanical Construction. Journal of Construction Engineering and Management, 125(03), 176–84.

Hegazy, T (1999) Optimization of Resource Allocation and Leveling Using Genetic Algorithms. Journal of Construction Engineering and Management, 125(03), 167–75.

Li, H, Shen, L Y and Love, P E D (1999) ANN-Based Mark-Up Estimation System with Self-Explanatory Capacities. Journal of Construction Engineering and Management, 125(03), 185–9.

Shen, L, Drew, D and Zhang, Z (1999) Optimal Bid Model for Price-Time Biparameter Construction Contracts. Journal of Construction Engineering and Management, 125(03), 204–9.

Smith, S D (1999) Earthmoving Productivity Estimation Using Linear Regression Techniques. Journal of Construction Engineering and Management, 125(03), 133–41.

Torbica, Z M and Stroh, R C (1999) Impact of Total Quality Management on Home-Buyer Satisfaction. Journal of Construction Engineering and Management, 125(03), 198–203.

Wang, S Q, Tiong, R L K, Ting, S K and Ashley, D (1999) Political Risks: Analysis of Key Contract Clauses in China's BOT Project. Journal of Construction Engineering and Management, 125(03), 190–7.